Ninevah All Sectors

1.Oil and Gas Sector

None

 2. Electricity Sector

None

 3. Communication Sector

None

 

 4. Health and Environment Sector

Investment opportunity in Environment Sector

No. Department Project name Location
1 Observe and asses industrial activities and services. Monitoring gas and fine particles emissions due to polluted industrial and services activities. Oil refineries, power stations, cement factories and hospitals in Baghdad and provinces.
2 Monitoring chemical materials and asses polluted sites. Treating oil waste activities –  All oil fields in provinces,

–  Oil refineries

–  Leaks resulting from broken pipes- polluted soil

Treating chemically polluted sites. All provinces, priority to the most contaminated sites.
Electric and electronic waste recycling Locations following environmental instructions regarding recycling wastes.
3 Climate changes and air type control Supply and install fixed station for noise metering in all provinces except KRG all provinces except KRG
Supply and install fixed station for noise metering non- ionized ray in Baghdad and provinces. Baghdad and provinces

Investment opportunity sent by Ministry of higher education and Scientific Research

no Project name Type of opportunity Province
1 General University Hospital 600 beds New Mosul

 5. Housing and Infrastructure sector

 

No. Project name Location allocated area in dunem ** Province Notes
1 Besan housing complex Mosul 18 Nineveh Red zone, project postponed
2 Khazna Tebe housing complex Mosul 26 Nineveh Red zone, project postponed
3 Kokjely housing complex Mosul 46 Nineveh Red zone, project postponed

6. Transportation Sector

First: Railways State Company

no Project name Details length Number of lines Signals & communication Axial load/ ton  Speed (km/h) Total transport (million) Estimate cost (million USD) Project implementation period
passengers Goods/ton passengers Goods/ ton Acquisitions implementation total
1 Mousil- Dehouk- Zakho- Turkey Designs were conducted by British consulting company (Henderson Hughes) 1982, updated by Czech companies, EKB, CZ Group, Power Office. 160 double ERTMS/ level 2 25 200 140 1 55 450 2157 2607 3 years
2 (Baghdad- Baquba- Kirkuk-Erbil- Mousil) branch line (Baquba- Khanaqeen- Munthirya- Iran) detailed designs were conducted by French consulting company (Sorfrel) 1982, currently updated by Czech consulting company (CZ Group).double line length 455km single line length 200km, can be doubled. Total length of main and branches is 700-750 km 700 mixed ERTMS/ level 2 25 250 140 6 20 1650 7000 8650 7 years

Second: State Company for Civil Aviation

No. Agency Project name Location Plot no. Area Estimated cost in USD/time Notes
1 State Company for Civil Aviation 1-      Rehabilitation & development of Mosul International Airport Nineveh/ Mosul international Airport 4000m² 126 b ID ·         Estimated cost for the unit before 2014 is 120 b ID

·         Total estimated cost for the damaged units 120 b ID

·         Estimated cost for the damaged furniture and assets before the crises 3.703.000.000 ID. Type of damage: total damage more than %40


 7. Industry and Minerals sector

Available Investment Opportunities at Ministry of Industry and Minerals announced as Investment Opportunities which includes (New Projects and Rehabilitation Projects)

No Project State Company Investment type Required investment Location
1 Yeast and sugar factory State Company for Food Industries

 

Rehabilitation and Development

 

Nineveh
2 Pillars and hillan stone Factory – Badoosh State Company for construction Industries Rehabilitation and Development Nineveh
3 Industry zone State agency for industrial development Investment Nineveh
4 Intravenous Solution Factory State Company for medication and medical supplies / Samara Rehabilitation and Development Nineveh
5 medical swabs  Factory State Co. for leather and textiles industries Rehabilitation and Development Mosul
6 Waladi factory for clothing Rehabilitation and Development Mosul
7 Textile Factory (Ready Made Garments Factory) Rehabilitation and Development Mosul
8 Bartla Sewing Factory (Ready Made Garments Factory) Rehabilitation and Development   Mosul

Technological Incubator for Advanced Technologies for Intelligent Education in Iraq

The project sponsors innovations and patents to be implemented on the ground in addition to providing advanced technologies for intelligent education in educational institutions in Iraq on an area of (10) dunem

  • Establishment of a factory to produce medical syringes
  • Laboratory for the production of medical syringes of all sizes and uses, on a part of land area (12) dunem
  • Establishment of a laboratory to produce medical solutions
  • Laboratory for the production of medical solutions (disinfectants, solutions for medical laboratories, etc.) on part of the land area (12) dunem
  • Medical pharmaceutical production plant
  • A laboratory specialized in the production of medical drugs on part of land area (12) dunem

The investment opportunities presented for investment by Provinces Investment Commissions (PICs)

 

First: Pure Sulfur projects

  1. The pure sulfur mining and extraction project in Mashraq Field 2 / Nineveh province.
  2. The pure Sulfur Extraction and Mining Project in Mashraq Field 3 / Nineveh Governorate.
  3. The pure Sulfur Extraction and Mining Project in Lizka field / Nineveh province.

 

Second: Cement projects

  • Cement Plant Project / Nineveh province.

 

8. Tourism Sector

None

9. Education Sector

None

 

 10. Services Sector

State Company for Central Markets

No. Type Location Area in dunum Province Notes
1 Mosul market building 7/995 Dis. 41 2 Nineveh In the right side of the city in an important commercial location

 

11. Youth and Sport Sector

No Project Name Location Area Province
1 Al-Dawasah Stadium (construction and renovation of the modern mall, a two-story hall, swimming pool shops and rehabilitation of the Grand Pedestrian Stadium and a multi-purpose sports hall and a stadium 432/6 Jewar Al Mousil 10 dunem Nineveh
2 Closed hall 432/7 Jewar Al Mousil Nineveh
3 Olympic pool 54/46 Ulmish Nineveh
4 plot 432/5 Jewar Al Mousil 23 ulk Nineveh
5 plot 2760/10 m52 Qojaq 1 dunem Nineveh
6 plot 8 m47 New mankoba 1 dunem Nineveh
7 Part of plot 275/2m 40 Qadhiya 8 dunem 22 ulk Nineveh

 

12. Agriculture Sector

 

Agricultural Investment opportunities in Nineveh

Seq. District / Township County No. / Plot No. Area / dunam Type Availability of water share/ source Ground waters depth Soil Analysis

PH- type 

Groundwater validity  Location from irrigation projects Coordinates

x

y

Notes
1 Singar – Center 1/18 Sito 200 Rocky / woods Not available/ Wells Less than 100m 9.6- Gypsum 2500 Milimosz 90km from Al Jezeera irrigation project X: 429180

Y: 3621550

Allocated for livestock projects
2 Sinjar/ Al Qairawan ½ /19 Um Al Shababeet 100 Salty for projects Not available/ Wells 80-100 m 9.7- Gypsum More than 2000 milimosz 90km from Al Jezeera irrigation project X: 429100

Y: 3621500

Allocated for livestock projects
3 Singar – Center 18/ 85 Sinjar mountain 8000 Salty for projects Not available/ Wells 100-120m 8.5 Calcic Less than 2000 milimosz 90km from Al Jezeera irrigation project X: 442000

Y: 3621410

Allocated for woods

 

Leave a Reply

Your email address will not be published. Required fields are marked *