Kirkuk All Sectors

Investment Opportunities in Kirkuk Governorate

1.Oil and Gas Sector

None

2. Electricity Sector

None

 

3. Communication Sector

None

 4. Health and Environment Sector

Investment opportunities in health sector announced by the MoH

No. Project name Type of opportunity Province
1 Adding 100 beds to the pediatric hospital + new 50 bed Thalassemia center new Kirkuk
2 Pediatric hospital 100 beds Rehabilitation and development Kirkuk
3 Kirkuk General hospital 200 bed New Kirkuk
4 teaching  hospital 400 beds with furniture and supplies new Kirkuk

Investment opportunity in Environment Sector

No. Department Project name Location
1 Observe and asses industrial activities and services. Monitoring gas and fine particles emissions due to polluted industrial and services activities. Oil refineries, power stations, cement factories and hospitals in Baghdad and provinces.
2 Monitoring chemical materials and asses polluted sites. Treating oil waste activities –  All oil fields in provinces,

–  Oil refineries

–  Leaks resulting from broken pipes- polluted soil

Treating chemically polluted sites. All provinces, priority to the most contaminated sites.
Electric and electronic waste recycling Locations following environmental instructions regarding recycling wastes.
3 Climate changes and air type control Supply and install fixed station for noise metering in all provinces except KRG all provinces except KRG
Supply and install fixed station for noise metering non- ionized ray in Baghdad and provinces. Baghdad and provinces

5. Housing and Infrastructure sector

Available Investment Opportunities at Housing Sector*

No. Project name Location allocated area in dunem ** Province Notes
1 Housing complex (according to investor’s feasible study) Plot 2/20m 37 Kirkuk 749 Kirkuk  
2 Housing complex (according to investor’s feasible study) Plot 13/3 m 9 outside province 60 Kirkuk  
3 Housing complex (according to investor’s feasible study) Plot 97 m53 Kirkuk 223 Kirkuk  
4 Housing complex (according to investor’s feasible study) Plot 255 m 24 outside province 500 Kirkuk  
5 Housing complex (according to investor’s feasible study) Plot 13/3 Korkejal outside province 50 Kirkuk  
6 Housing complex (according to investor’s feasible study) Plot 100/56 Sekanyan outside province 47 Kirkuk  
7 Housing complex (according to investor’s feasible study) Plot 5/1703Sayada inside province 50 Kirkuk  

 

 6. Transportation Sector

 

no Project name Details length Number of lines Signals & communication Axial load/ ton  Speed (km/h) Total transport (million) Estimate cost (million USD) Project implementation period
passengers Goods/ton passengers Goods/ ton Acquisitions implementation total
1 (Baghdad- Baquba- Kirkuk-Erbil- Mousil) branch line (Baquba- Khanaqeen- Munthirya- Iran) detailed designs were conducted by French consulting company (Sorfrel) 1982, currently updated by Czech consulting company (CZ Group).double line length 455km single line length 200km, can be doubled. Total length of main and branches is 700-750 km 700 mixed ERTMS/ level 2 25 250 140 6 20 1650 7000 8650 7 years
2 Kirkuk- Sulaimaniya Detailed designs were conducted recently by Mozer Automatica consulting Company 120 Single can be doubled ERTMS/ level 2 25 200 140 2 6 350 3000 3350 5 and a half years

 

 7. Industry and Minerals sector

None

8. Tourism Sector

No. Project Location Allocated  Land Province
1 Al-Sha’ab Tourist Park Outside the basic design/Kirkuk Municipality 169 Dunam Kirkuk
2 Al-Ihtifalat Square Park Plot 296/6/section 39m/ Kirkuk Municipality 15 Dunam Kirkuk
3 Tourist city Ploy 522/16m 150 dunem Kirkuk

 

9. Education Sector

None

10 . Services Sector

State Company for Central Markets

No. Type Location Area in dunum Province Notes
1 Kirkuk market building 31/412 dis. 67 Bukler & Shaterlow 2 Kirkuk City center
2 Kirkuk plot 5/234 Dis. 39/ ninety 7 Kirkuk Located in a good locating in city center. Commercial monitoring office, MoI, and Handmade carpet factory used to occupy part of the land, all were sentenced to be cleared. Cigarettes and Tobago factory is cleared and land was delivered.
3 Kirkuk plot 5/235 Dis. 39/ ninety 10 Kirkuk Located in a good locating in city center. Part of plot is occupied by Carpet Factory which is sentenced of evacuation. Samara Medication Factory is under continuous legal procedures.

 

Available Investment Opportunities in Services Sector according to Provinces Investment Commissions

No. Project Location Area Province
1 Commercial complex 31/412 dis 67 2 Dunam Kirkuk
2 Commercial complex 285/453 2 Dunam Kirkuk
3 Commercial complex Plot 355/44/m39 1 Dunam Kirkuk
4 Commercial complex Plot 8/1/m 52/ outside the basic design of the Province 20 Dunam Kirkuk
5 Commercial complex Plot 1250/66 m Kehaya within the basic design of the Province 1200m² Kirkuk
6 Commercial complex 112/6 Baghdad road 10 dunam Kirkuk
7 Commercial complex 112/2329 m53 Temari/td> 2 dunam Kirkuk

 

11. Youth and Sport Sector

No Project Name Location Area Province
1. Olympic pool 112/2056 m 53 17 dunem Kirkuk
2. 1st June pool with 3 outdoors tartan playground + penta grass field 510/4625 m 39 near Adala Police Station 4 dunem Kirkuk
3. Constructing a modern sports and vertical building project (balling hall + fitness hall + bodybuilding hall (with commercial mall) (lease) 11618/m 67 2 dunem Kirkuk
4. Sport investment for a plot 4/691 m 53 khasa temari 9 dunem 23 ulk Kirkuk
5. A regular swimming pool with multi-use gymnasiums and activities 100/1698 m 36 Daqooq 6 dunem 26 ulk Kirkuk
6. Shops and indoor pool  (part of Daqooq club) 100/1697 m 36 Daqooq 3 dunem Kirkuk
7. Plot 46/7 m53 khasa temari 8 dunem Kirkuk

 

 

12. Agriculture Sector

None