In order to cope with the advancement achieved in Bismayah New City project
Bismayah project management department raises the Autoclave factory production capacity

b7

Bismayah project management department started raising the production capacity of the autoclave factory, which is one of the most important factories constructed by Hanawah Co., to reach 1063 m³ per day. This raise came to cope with the rapid advancement taking place in Bismayah project site.
An official source in the executing company explained that the factory is producing light concrete fire resistant blocks of high stiffness  to be used as internal walls in the housing units separating rooms and corridors.
He added that the production process in the factory is being conducted according to the latest industrial technologies through putting raw materials (sand , cement and asphalt) in modern machines that crushes these materials after adding  an hydrate substance to be mixed together.
The production starts by casting blocks of special technical specifications which would be later treated and primarily cut, while the last stage includes inserting the light blocks into the autoclave furnaces to be finally treated and dried by steam.
The product becomes ready for use 12 hours after drying process when then is packed and transferred to warehouses.
Worth to mention that the light block is much more preferable than other concrete materials used in construction for the ease of  moving and transferring not to mention its high resistance for low and high temperatures, fires in addition to much more other merits.

Comments are disabled.