the project designs, and in contracts       .(‫ﻛﻤﯿﺔ اﻷﻋﻤﺎل اﻟﻤﻨﺠﺰة )اﻟﺬرﻋﺔ‬
     where payments are made to the
     contractor based on the amount of           ‫ وﯾﺴﺘﺨﺪم ﻓﻲ اﻟﻌﻘﻮد اﻟﺘﻲ ﯾﺘﻮﻟﻰ‬:‫اﻟﻜﺘﺎب اﻷﺻﻔﺮ‬        •
     work completed (bill of quantities).        ‫ ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ ﻗﯿﺎﻣﮫ‬،‫اﻟﻤﻘﺎول ﻓﯿﮭﺎ ﺗﻨﻔﯿﺬ اﻟﺘﺼﺎﻣﯿﻢ‬
                                                 ‫ وﯾﻌﺘﺒﺮ ھﺬا اﻟﻌﻘﺪ ﻧﻤﻮذج ﻋﻘﺪ ﻣﺘﻮازن‬.‫ﺑﺎﻹﻧﺸﺎءات‬
 • The Yellow Book is used in contracts          ‫ﺑﯿﻦ طﺮﻓﯿﮫ وﯾﺘﻢ اﻟﺴﺪاد ﻓﯿﮫ اﻟﻰ اﻟﻤﻘﺎول ﻋﻠﻰ أﺳﺎس‬
     where the contractor carries out the
     design as well as the actual                                                    .‫ﻣﺒﻠﻎ إﺟﻤﺎﻟﻲ‬
     construction. The Yellow Book is a
     model of a balanced contract between        ‫ وﯾﺴﺘﺨﺪم ﻓﻲ اﻟﻤﺸﺎرﯾﻊ اﻟﺘﻲ ﯾﺘﻮﻟﻰ‬:‫اﻟﻜﺘﺎب اﻟﻔﻀﻲ‬      •
     two parties, in which payment is made       ‫ ﻋﻠﻰ أن ﯾﺘﻢ ﺳﺪاد‬،‫اﻟﻤﻘﺎول ﻓﯿﮭﺎ إﻋﺪاد ﺗﺼﺎﻣﯿﻤﮭﺎ‬
     to the contractor on a lump-sum basis.      ،‫ وﻋﻠﻰ أﺳﺎس اﻹﻧﺠﺎز اﻟﻜﻠﻲ‬،‫ﻣﺒﻠﻐﮭﺎ ﺑﺸﻜﻞ اﺟﻤﺎﻟﻲ‬

 • The Silver Book is suitable for use in                        .‫ﺣﯿﺚ ﯾﺘﺤﻤﻞ اﻟﻤﻘﺎول ﻛﺎﻓﺔ اﻟﻤﺨﺎطﺮ‬
     projects where the contractor prepares
     the designs, in which payment is            ‫ وﯾﺴﺘﺨﺪم ﻟﻠﻤﺸﺮوﻋﺎت اﻟﺼﻐﯿﺮة‬:‫اﻟﻜﺘﺎب اﻷﺧﻀﺮ‬           •
     made on a lump-sum basis and based          ‫ أو ﻟﻸﻋﻤﺎل اﻟﻤﺘﻜﺮرة‬،‫ذات رؤس اﻷﻣﻮال اﻟﻤﻨﺨﻔﻀﺔ‬
     on full completion, whereby the             ‫أو ﻗﺼﯿﺮة اﻟﻤﺪى اﻟﺘﻲ ﯾﻜﻮن ﺻﺎﺣﺐ اﻟﻌﻤﻞ ﻓﯿﮭﺎ‬
     contractor bears all risks involved.
                                                                       .‫ﻣﺴﺆوﻻً ﻋﻦ إﻋﺪاد اﻟﺘﺼﺎﻣﯿﻢ‬
 • The Green Book is used for small,
     low-capital projects, or for recurring      ‫ وﯾﺴﺘﺨﺪم ﻓﻲ اﻟﻤﺸﺎرﯾﻊ اﻟﺘﻲ ﯾﺘﺤﻤﻞ‬:‫• اﻟﻜﺘﺎب اﻟﺬھﺒﻲ‬
     or short-term works, where the              ‫ﻓﯿﮭﺎ اﻟﻤﻘﺎول اﻟﻤﺴﺆوﻟﯿﺔ اﻟﻜﺎﻣﻠﺔ ﻋﻦ اﻟﺘﻤﻮﯾﻞ واﻹﻧﺸﺎء‬
     employer is responsible for
     preparation of the designs.                             .‫واﻟﺘﺸﻐﯿﻞ وﺑﺈﺷﺮاف أﻗﻞ ﻣﻦ رب اﻟﻌﻤﻞ‬

 • The Gold Book is used for projects in         ‫وھﻨﺎﻟﻚ ﻣﻨﺸﻮرات أﺧﺮى ﯾﻤﻜﻦ اﻻطﻼع ﻋﻠﯿﮭﺎ ﻋﻠﻰ‬
     which the contractor bears full             - ‫ﻣﻮﻗﻊ اﻹﺗﺤﺎد اﻟﺪوﻟﻲ ﻟﻺﺳﺘﺸﺎرات اﻟﮭﻨﺪﺳﯿﺔ )ﻓﺪك‬
     responsibility for financing,
     construction and operation, with less                                         .(www.fidic.org
     oversight by the employer.
                                                 ‫ﻻ ﯾﻌﻨﻲ إﺳﺘﺨﺪام ﺷﺮوط ﻓﺪك اﻹﻟﺘﺰام ﺑﺤﺮﻓﯿﺔ‬            .2
There are other publications available on        ً‫ وإﻧﻤﺎ ﯾﻤﻜﻦ ﺗﻌﺪﯾﻠﮭﺎ وﻓﻘﺎ‬،‫ﻧﺼﻮﺻﮭﺎ ﻛﻤﺎ وردت‬
the FIDIC website (www.fidic.org).
                                                 ‫ وﺑﻤﺎ ﯾﻨﺴﺠﻢ واﻟﻨﺼﻮص‬،‫ﻟﻠﻤﻔﺎوﺿﺎت ﺑﯿﻦ اﻟﻄﺮﻓﯿﻦ‬
2. Use of FIDIC terms does not mean
    adhering to them literally as written;       ‫ ﻋﻦ طﺮﯾﻖ ﺗﻨﻈﯿﻢ ﻣﺎ‬،‫اﻵﻣﺮة ﻓﻲ اﻟﺘﺸﺮﯾﻌﺎت اﻟﻤﺤﻠﯿﺔ‬
    rather, they can be amended based on
    negotiations between the two parties.        ،‫ﯾﻌﺮف ﺑﺎﻟﺸﺮوط اﻟﺨﺎﺻﺔ اﻟﻤﻌﺪﻟﺔ ﻟﺸﺮوط ﻓﺪك‬
    These conditions can also be adapted to      ‫ﺧﺼﻮﺻﺎً وأن اﻟﻤﺸﺎرﯾﻊ اﻹﺳﺘﺜﻤﺎرﯾﺔ ﻻ ﺗﺘﻀﻤﻦ دﻓﻊ‬
    the prevailing provisions under local
    legislation through what is known as         ‫ وﺗﺒﻨﻰ ﻋﻠﻰ‬،‫أﯾﺔ ﻣﺒﺎﻟﻎ ﻧﻘﺪﯾﺔ ﻣﻦ ﻗﺒﻞ ﺻﺎﺣﺐ اﻟﻌﻤﻞ‬
    “specially amended FIDIC conditions”
    – especially since investment projects       ‫ إﻻ ﻓﻲ ﺣﺎﻻت‬،‫أﺳﺎس ﺗﺤﻤﻞ اﻟﻤﺴﺘﺜﻤﺮ ﻟﺘﻠﻚ اﻟﻤﺨﺎطﺮ‬
    do not entail cash payments by the
                                                 ‫ وھﻨﺎ ﻧﻮد اﻹﺷﺎرة إﻟﻰ إﻣﻜﺎﻧﯿﺔ اﻹﺳﺘﻌﺎﻧﺔ‬.‫اﺳﺘﺜﻨﺎﺋﯿﺔ‬