Page 98 - Microsoft Word - FINAL COPY - A Legal Guide to Investing in Iraq _12-7-2015_ _6_.docx
P. 98
to the First Party (“Notice of ﯾﺠﻮز ﻷي طﺮف أن ﯾﺤﯿﻞ أي ﻣﺴﺄﻟﺔ ﻋﻠﯿﮭﺎ .8
Termination”). ﺧﻼف ﺗﺘﻌﻠﻖ ﺑﺤﺎﻟﺔ اﻹﺧﻼل اﻟﻤﺪﻋﻰ ﺑﮭﺎ ﻣﻦ
ﻗﺐ اﯾﺎﻟﻄﺮف أو ﺑﺈﺷﻌﺎر اﻟﺘﻨﺒﯿﮫ أو ﺑﺈﺷﻌﺎر
8. Either Party has the right to refer ﻣﻦ ھﺬا26 اﻹﺧﻼل ﻟﺤﺴﻤﮫ ﺑﻤﻮﺟﺐ اﻟﻘﺴﻢ
any disputed question relating to the اﻟﻌﻘﺪ ﻓﻰ أي وﻗﺖ ﺑﯿﻦ ﺗﺎرﯾﺦ إﺷﻌﺎر اﻟﺘﻨﺒﯿﮫ
claimed breach by Either Party, the وﻻ ﯾﺤﻖ.واﻟﺘﺎرﯾﺦ اﻟﻤﺤﺪد ﻓﻲ إﺷﻌﺎر اﻹﺧﻼل
Notice of Alert or the Notice of ﻻي ﻣﻦ اﻟﻄﺮﻓﯿﻦ إﻧﮭﺎء ھﺬا اﻟﻌﻘﺪ ﺧﻼل اﻟﻮﻗﺖ
Breach to be resolved in accordance اﻟﺬي ﺗﻜﻮن ﻣﺴﺄﻟﺔ اﻟﻨﺰاع اﻟﻤﺸﺎر إﻟﯿﮭﺎ ﻓﻲ ھﺬا
with Section 26 of this Contract at
any time between the date of the .26 اﻟﻘﺴﻢ ﺟﺎري اﻟﻨﻈﺮ ﻓﯿﮭﺎ وﻓﻘﺎً ﻟﻠﻘﺴﻢ
Notice of Alert and the date
specified in the Notice of Breach. ﻋﺪم إﺳﺘﺨﺪام ﺣﻘﮫ ﻓﻲ،ﯾﺤﻖ ﻟﻠﻄﺮف اﻟﺜﺎﻧﻲ .9
Either Party does not have the right ًإﻧﮭﺎء اﻟﻌﻘﺪ ﺧﻼل ﻣﺪة )ﻋﺪد اﻷﯾﺎم( ﯾﻮﻣﺎ
to terminate this Contract during the وإﻛﻤﺎل اﻟﻤﺮﺣﻠﺔ اﻟﺘﻄﻮﯾﺮﯾﺔ اﻟﻤﺘﺼﻠﺔ ﺑﺤﺎﻟﺔ
time in which the disputed question ﻓﻲ ھﺬه.اﻹﺧﻼل اﻟﺘﻲ ﻗﺎم ﺑﮭﺎ اﻟﻄﺮف اﻷول
referenced in this item is being اﻟﺤﺎﻟﺔ ﺗﺴﺘﻤﺮ ﻛﺎﻓﺔ اﻟﺤﻮاﻓﺰ واﻟﺘﺴﮭﯿﻼت
considered in accordance with ،اﻟﻤﻤﻨﻮﺣﺔ ﺑﻤﻮﺟﺐ ھﺬا اﻟﻌﻘﺪ واﻟﻘﺎﻧﻮن اﻟﻨﺎﻓﺬ
Section 26. وﯾُﻤﻨﺢ اﻟﻄﺮف اﻟﺜﺎﻧﻲ ﻣﺪة إﺿﺎﻓﯿﺔ ﺗﻌﺎدل ﻣﺪة
ﻣﻌﺎﻟﺠﺔ ﺣﺎﻟﺔ اﻹﺧﻼل اﻟﺘﻲ ﻗﺎم ﺑﮭﺎ اﻟﻄﺮف
9. The Second Party has the right if it
so chooses to not exercise its right .اﻷول وآﺛﺎرھﺎ
to terminate the Contract within a
period of DAYS days and complete ﺣﻘﻮق اﻟﺪاﺋﻨﯿﻦ ﺑﻄﻠﺐ اﻟﻀﻤﺎﻧﺎت ﻣﻦ.24 اﻟﻘﺴﻢ
the development stage relating to اﻟﻄﺮف اﻟﺜﺎﻧﻲ وﻓﻲ اﻟﺤﻠﻮل ﻣﺤﻠﮫ
the breach carried out by the First
Party. In that case, all incentives and ﯾﺤﻖ ﻟﻠﺪاﺋﻨﯿﻦ اﻟﺤﺼﻮل ﻋﻠﻰ ﺿﻤﺎﻧﺎت ﻋﯿﻨﯿﺔ .1
privileges granted in accordance ﺑﻤﺎ ﻓﻲ،ﻟﻜﺎﻓﺔ اﻟﻤﻮﺟﻮدات اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻟﻤﺸﺮوع
with this Contract and Applicable ذﻟﻚ أﺻﻮل اﻟﻤﺸﺮوع وﺣﻘﻮق اﻟﻌﻘﺪ وﺣﻘﻮق
Law shall continue and the Second ﻓﯿﻤﺎ ﻋﺪا.اﻟﻤﻠﻜﯿﺔ واﻟﺘﻨﻔﯿﺬ ﻟﻠﻄﺮف اﻟﺜﺎﻧﻲ
Party shall be granted an additional
period of time equivalent to the .اﺳﺘﺨﺪام ارض اﻟﻤﺸﺮوع ﻛﻀﻤﺎن اﺿﺎﻓﻲ
duration of addressing the breach
and its consequences perpetrated by
the First Party.
Section 24. Creditors’ Rights to
Guarantees from, and to
Replace the Second Party
1. Creditors have the right to obtain
collateral security over all assets
relating to the Project, including
Project Assets, contract rights, and
ownership interests of the Second
Party except using the project land
as collateral security.
94